On Wotech production line, there are two times start-up check.The first time is 30 mins performance checking, the second time is before packing. After drying, the heat pump may have loose wiring and bad contact, so it is necessary to have second start-up.
For more information, welcome to visit http://www.ecowotech.com/site/blog
No comments:
Post a Comment