This time we visited a amazing hot water renovation project in Australia, The central hot water supplying of apartment in downtown, changed from electric water heater with 2*1 tons tanks to 4 set WOTECH heat pumps BC-19.5 with 9*500L tanks. This project not only reasonable use of place, but also greatly reducing the operation cost.



At the sense, we could see the heat pumps were installed in the parking lot, the water tanks were placed in a very small  place. This design is very good, it will not affect people's living space, at the same time, the waste gas from parking lot could be used as the heat source of heat pump by increasing air ducts.


The air source heat pumps is being given attention by more and more consumers because of its obvious safety, energy conservation. Choose WOTECH, accomplish great project.