Tuesday 10 November 2015

The Second Times Start-up Check of Wotech Heat Pump

On Wotech production line, there are two times start-up check.The first time is 30 mins performance checking, the second time is before packing. After drying, the heat pump may have loose wiring and bad contact, so it is necessary to have second start-up.
For more information, welcome to visit http://www.ecowotech.com/site/blog
heat pump start-up check

No comments:

Post a Comment

blog directory
blog directory